Location Hong Kong
Time 2019
Overview
The VEC consists of a 3-storey inspection hall and a 7-storey office block with a total construction floor area of 64,350m2. It replaces the three existing VECs in Kowloon Bay and To Kwa Wan and the daily handling capacity can be 1,000 vehicle inspections per day. During construction, 3 nos of DCA400ESEI gensets with SSME were deployed for electrical power provision for 4 tower cranes and site facliities such as lighting, pumps, hoist lifts, welders, etc. Remote monitoring can keep track of the genset condition and 43% fuel cost reduction was made.